iScheduler-矿山生产调度模块

ThreeDify iScheduler (iScheduler) 可用于编制露天和地下矿山短期,中期及长期生产调度计划。它交互式的用户界面为用户提供了根据相关参数灵活调整生产调度计划的功能。同时还能进行三维动画模拟、自动生成相应的图表, 如Gantt图,PERT图和网络图,以及资源均衡算法等工具。

Key Features

  • Interactive scheduling for short to long term planning of both open-pit and underground mines with support for multiple block models, stope designs, mine development layouts and stockpiles.
  • Calendar based activity and resource schedules with Gantt Chart, PERT and Network Diagram representations.
  • Interactive Activity and Dependency Editor for creating associative 3D activities and dependencies from mining objects.
  • Options for automatic activity sequencing and Resource Leveling.
  • Two-way interface with Microsoft Project through XML format.
Screenshots
System requirements:

OS: 64-bit Windows 7, 8.1 and 10
Disk Space: 20 GB
Ram: 8 GB
CPU: Dual core or Quad Core CPU
Additional Requirements: A mid-class video card with a good OpenGL driver, e.g., ATI Radeon 5650 HD or higher. We do NOT recommend NVdia gaming video cards, especially GeForce 400 to 500 series, as they are known to have severely sub-standard OpenGL drivers.