Integrated Life-Of-Mine and Production Scheduler for Underground Mines
From Stope or Cave Designs to Gantt Charts, GeoMine iScheduler-UG is an integrated production scheduler for underground mines. iScheduler-UG features a fully interactive 3D activity and dependency editor, activity and resource Gantt Charts, a PERT chart and a Network Diagram, as well as a Resource Leveling algorithm. iScheduler-UG is purposely built for sequencing and scheduling various kinds of mining activities and resources for short to long-term planning of underground mines. Activities and dependencies can be generated automatically or manually through its powerful interactive Activity and Dependency Editor that supports unlimited undo/redo.
iScheduler-UG also offers a unique and powerful feature called Activity Specialization that allows the mine planner to easily turn their long or med-term underground schedules into short-term (weekly or daily) schedules or to mix and match long/mid-term activities with short term activities in a single production schedule.
iScheduler-UG Key Benefits
- Automatic and interactive scheduling for short to long-term planning of underground mines with support for multiple block models, stopes, caves stope/cave slices and mine development layout.cave
- Calendar based activity and resource schedules with Gantt Chart, PERT and Network Diagram representations.
- Interactive Activity and Dependency Editor for creating associative 3D activities and dependencies from various mining objects.
- Manual and/or automatic activity sequencing and Resource Levelling.
- Activity Specialization for mix and match long term and short term activities in a single schedule
- Schedule animation including playback, pause, resume, fast forward and backward.
- Directly use GeoMine-Stopemizer and GeoMine-OptimCut results as input to create optimal and practical stoping sequences for long-term planning.
- Intuitive stope and mine opening slicing tools for creating short-term production schedules
- Two-way interface with Microsoft Project through XML format.
iScheduler-UG Feature List
iScheduler-UG Long-Term Scheduling sub-module:
Create strategic and/or production schedules from stopes and mine layouts. Optionally use optimal cut-off grade and production rate policies created by OptimCut.
iScheduler-UG Short-to-Mid Term sub-module:
Interactively create short-term stope slice and mine opening segment activities incorporating precedence constraints.
Mining Task Generation:
Create and schedule non-3D activity (logical) tasks.
Resource Management:
Create resources and assign them to mining activities or tasks; Level resources that are assigned to activities or tasks.
Gantt Chart sub-module:
Create Gantt-Charts, Resource Charts or Network Diagrams from mining activities and tasks.
Activity Specialization:
Turn long(yearly) or mid-term(quarterly or monthly) schedules to short-term (daily or weekly) schedules
Mix and match long/mid-term activities with short-term activities in a single schedule.
Schedule Animation:
Play, pause, resume, fast forward and backward medium or short-term schedules.