FlowPit Feature List
|
Generation of nested pits (for creating schedules that either maximize NPV or meeting the production rates with iScheduler). |
Powerful block model preview and inspection capabilities (via the free GeoMine Foundation module) allows the user to detect and correct potential errors in the input block model before optimisation starts. |
Powerful post-optimisation Visual Report Generator allows maximum flexibility in report generation without custom scripting. |
Handling very large block models with more than 30 mil non-air blocks |
Support for exclusion regions (property lines that must not be crossed) can be specified as polylines in a DXF file. |
Generation of the optimum ultimate pit and a set of nested pits as input to iScheduler. Two types of nested pits can be generated: LG nested pits for creating LOM schedules with maximal NPV and equal-sized geologically optimum nested pits for creating smooth schedules with relatively constant production rate. (Pushbacks and/or Schedules must be created with iScheduler, FlowPit only generates nested pits as input to iScheduler) |
Output to CSV format and to DXF format |
Exploiting parallelism on multi-core CPUs for ultimate performance. |
Flexible block value formula editor (made possible by a powerful cell scripting engine) supports multi-minerals, stockpiling options, partial block calculations as well as unlimited user conditions or constraints. FlowPit’s Cell Scripting Engine opens a door to virtually infinite possibilities for mine planners that make a difference. |
Slope angle can vary by both regions and rock types within regions, or by sectors and/or by levels. |
Option to normalize and reblock input block model if needed. |
Supports a large range of ASCII file formats exported by all General Mining Packages including ThreDify CoreBlock and ThreeDify GeoModeler. |
Built-in real-time 3D viewer of final and nested pits. |
Includes all features in GeoMine Foundation module |
Sensitivity analysis allows the user to see the impact of changes to any variable (price, costs) on the NPV of the project, as well as the impact of geological uncertainty. |
Also includes all features of GeoMine Foundation Module. Please click the link for GeoMine Foundation Feature List. |
Quotation for Permanent or Subscription License, Please [button size=’normal’ color=’btn-dark-grey’ link=’https://threedify.com/?p=31′ block=’0′]Contact us[/button] |